Stick Coil Input Voltage Inspection
Radiator Fan Relay Removal/InstallationMeter Operation Inspection
Check 1-1: Switching Inspection
Turn the ignition switch to ON and check the following.
The all LCD segments [A] appear for 3 seconds.
The warning indicator light (Red LED) [B] goes on for 3
seconds and then goes off in a moment after that goes
off.
The warning indicator light (Yellow LED ...
Check 3-6: Neutral Indicator Light (LED) Inspection
Connect the leads in the same circuit as Check 3-2.
Connect the terminal [8] to the battery (–) terminal.
Check that the neutral indicator light (LED) [A] goes on.
If the indicator light does not go on, replace the meter unit.
...
Oil Cooler Installation
Replace the O-ring [A] with a new one.
Apply grease to the new O-ring.
Install the water hoses and hose clamps [A] as shown in
the figure.
Water Hose (About 300 mm, 11.8 in.) [B]
Water Hose (About 130 mm, 5.1 in.) [C]
Yellow Paint [D]
Tighten:
Torque - Water Hose Clamp S ...