Kawasaki Ninja Service Manual: Rear Frame Front Installation

Kawasaki Ninja Service Manual / Frame / Frame / Rear Frame Front Installation

Torque - Rear Frame Front Bolts: 44 N·m (4.5 kgf·m, 32 ft·lb)

Rear Footpeg Bracket Bolts: 25 N·m (2.5 kgf·m, 18 ft·lb)

Muffler Body Mounting Bolt: 25 N·m (2.5 kgf·m, 18 ft·lb)

Rear Frame Front Removal
Remove: Rear Frame Rear (see Rear Frame Rear Removal) Rear Fender Front (see Rear Fender Front Removal) Rear Footpeg Bracket Bolts [A] Rear Footpeg Bracket [B] Rear Frame Front Bolts [C] ...

Frame Inspection
Visually inspect the frame for cracks, dents, bending, or warp. If there is any damage to the frame, replace it. WARNINGA repaired frame may fail in use, possibly causing an acc ...

Other materials:

Crankcase Assembly
NOTICE The upper and lower crankcase halves are machined at the factory in the assembled state, so the crankcase halves must be replaced as a set. With a high flash-point solvent, clean off the mating surfaces of the crankcase halves and wipe dry WARNINGGasoline and low flash-poin ...

Oil Pressure Switch Installation
Using a high flash-point solvent, clean off any oil or dirt that may be on the silicone sealant coating area. Dry them with a clean cloth. Apply silicone sealant to the threads of the oil pressure switch, and tighten it. Sealant - Liquid Gasket, TB1211: 56019-120 Torque - Oil Pressure ...

Oxygen Sensor Heater Power Source Voltage Inspection
NOTE Be sure the battery is fully charged. Turn the ignition switch to OFF. Remove the fuel tank (see Fuel Tank Removal in the Fuel System (DFI) chapter). Disconnect the oxygen sensor lead connector and connect the measuring adapter [A] between these connectors as shown in the fig ...