Kawasaki Ninja Service Manual: Frame

Kawasaki Ninja Service Manual / Frame / Frame

Rear Fender Front Installation
Installation is the reverse of removal. Note the following. Run the harness, cables and leads correctly (see Cable, Wire, and Hose Routing section in the Appendix chapter). When install ...

Rear Frame Rear Removal
Remove: Flap and Rear Fender Rear (see Flap and Rear Fender Rear Removal) Rear Frame Rear Bolts [A] Rear Frame Rear [B] Rear Frame Rear Installation Apply a non-permanent locking agent to ...

Other materials:

Wheel Bearing Damage Inspection
Raise the front wheel off the ground with the jack (see Front Wheel Removal in the Wheels/Tires chapter). Special Tools - Jack: 57001-1238 Jack Attachment: 57001-1608 Turn the handlebar all the way to the right or left. Inspect the roughness of the front wheel bearing by moving [A] ...

Swingarm Bearing, Sleeve Inspection
NOTICE Do not remove the bearings for inspection. Removal may damage them. Inspect the needle bearings [A] and ball bearing installed in the swingarm. The rollers and ball in a bearing normally wear very little, and wear is difficult to measure. Instead of measuring, visually inspec ...

Radiator Inspection
Remove the radiator (see Radiator and Radiator Fan Removal). Check the radiator core. If there are obstructions to air flow, remove them. If the corrugated fins [A] are deformed, carefully straighten them. If the air passages of the radiator core are blocked more than 20% by unremovable ...