Kawasaki Ninja Service Manual: Frame

Kawasaki Ninja Service Manual / Frame

Handlebar Installation
Apply a non-permanent locking agent to the threads of the handlebar positioning bolts and tighten them. Torque - Handlebar Positioning Bolts: 9.8 N·m (1.0 kgf·m, 87 in·lb) Install the steeri ...

Exploded View
10. US, CA, CAL and AU Models 11. ZX1000JD/KD G: Apply grease. L: Apply a non-permanent locking agent. R: Replacement Parts S: Follow the specified tightening sequence. 1. US, CA ...

Other materials:

Sprocket Wear Inspection
Visually inspect the engine and rear sprocket teeth for wear and damage. If the teeth are worn as illustrated, replace the sprocket, and inspect the drive chain wear (see Drive Chain Wear Inspection in the Periodic Maintenance chapter). Worn Tooth (Engine Sprocket) [A] Worn Tooth (Rear ...

Rear Brake Pad Installation
Check that the pad spring is in place on the caliper. Push the caliper piston in as far as it will go. Install the piston side pad [A] first, and then another pad. Fit the brake pad end into the recess [B] of the caliper holder. Install the pad pin and the plug. Tighten: Torque - ...

Oil Cooler Installation
Replace the O-ring [A] with a new one. Apply grease to the new O-ring. Install the water hoses and hose clamps [A] as shown in the figure. Water Hose (About 300 mm, 11.8 in.) [B] Water Hose (About 130 mm, 5.1 in.) [C] Yellow Paint [D] Tighten: Torque - Water Hose Clamp S ...