Kawasaki Ninja Service Manual: Frame

Kawasaki Ninja Service Manual / Frame

Handlebar Installation
Apply a non-permanent locking agent to the threads of the handlebar positioning bolts and tighten them. Torque - Handlebar Positioning Bolts: 9.8 N·m (1.0 kgf·m, 87 in·lb) Install the steeri ...

Exploded View
10. US, CA, CAL and AU Models 11. ZX1000JD/KD G: Apply grease. L: Apply a non-permanent locking agent. R: Replacement Parts S: Follow the specified tightening sequence. 1. US, CA ...

Other materials:

Swingarm Removal
Remove: Rear Wheel (see Rear Wheel Removal in the Wheels/Tires chapter) Mud Guard with Rear Brake Hose (see Mud Guard Removal in the Frame chapter) Rocker Arm (see Rocker Arm Removal) Remove: Brake Hose Clamp Bolt [A] Unscrew the swingarm pivot shaft nut [A]. Usi ...

Premuffler Chamber Installation
Replace the premuffler chamber gasket [A] with a new one. Install the premuffler chamber gasket to the premuffler chamber [B] until it is bottomed so that the chamfer side faces exhaust pipe [C]. Install the exhaust pipe clamp [D] as shown in the figure. Insert the projection [E] into ...

Check 3-7 Stop Watch Inspection
Connect the leads in the same circuit as Check 3-2. By pushing the upper button each time to set the stop watch mode. Connect the insulated auxiliary lead processed insulation to the terminal [13] as shown in the figure, then stop watch start to count. While count the stop watch, conn ...