Handlebar Installation
Exploded ViewEngine No. ZXT00JE003023
1. Heat Insulation Rubber Plate
2. For Air Switching Valve Hoses (Place the air switching valve above the
rubber plate.)
3. For Stick Coils
4. For Throttle Body Assy Holder #2 and #3
5. For Water Temperature Sensor
6. Insert the tab into the slot.
7. For Throttle Body Assy Holder #4
8. ...
Wiring Diagram (US, CA and CAL without KIBS Models)
ZX1000JC
ZX1000JD
...
Muffler Body Installation
Replace the muffler body gasket [A] with a new one.
Install the muffler body gasket to the premuffler chamber
[B] until it is bottomed so that the chamfer side faces premuffler
chamber.
Install the muffler body clamp [C] as shown in the figure.
Insert the projection [D] into the slot [ ...