Remove: Flap and Rear Fender Rear (see Flap and Rear Fender Rear Removal) Rear Frame Rear Bolts [A] Rear Frame Rear [B]

Rear Frame Rear Installation
Torque - Rear Frame Rear Bolts: 25 N·m (2.5 kgf·m, 18 ft·lb)
Frame
Rear Frame Front RemovalCheck 3-1: CAN Communication Line Resistance Inspection
Set the hand tester [A] to the ×1 Ω range and connect it
to the terminal [11] and [12] in the meter unit.
Special Tool - Hand Tester: 57001-1394
CAN Communication Line Resistance (at Meter Unit)
Standard: 122 126 Ω
If the tester reading is not specified, replace the meter ...
Air Switching Valve Removal
NOTICE
Never drop the air switching valve especially on a
hard surface. Such a shock to the air switching
valve can damaged it.
Remove the air cleaner housing (see Air Cleaner Housing
Removal in the Fuel System (DFI) chapter).
Disconnect the connector [A].
Disconnect the hoses [B] from ...
Kawasaki Intelligent anti-lock Brake System (KIBS,
For models equipped with KIBS)
KIBS regulates anti-lock braking performance
with more precision during
sports riding compared to a conventional
ABS system.
KIBS is designed to help prevent
the wheels from locking up when the
brakes are applied hard while riding
straight. KIBS automatically regulates
brake force using en ...