
Rear Seat Removal
FairingsCoolant Reserve Tank Installation
Install the following to the coolant reserve tank [A].
Pad [B]
Gasket [C]
Cap [D]
Collar [E]
Install the coolant reserve tank and tighten the bolt [F].
Run the hoses correctly (see Cable,Wire, and Hose Routing
section in the Appendix chapter).
Fill the coolant reserve tank with ...
Timing Rotor Installation
Install the timing rotor [A] on the crankshaft [B] with their
teeth [C] aligned.
Holding the timing rotor with the flywheel & pulley holder
and tighten the bolt.
Torque - Timing Rotor Bolt: 39 N·m (4.0 kgf·m, 29 ft·lb)
Special Tool - Flywheel & Pulley Holder: 57001-1605
I ...
Evaporative Emission Control System Inspection (CAL and SEA-B1 Models)
Inspect the canister as follows.
Remove the upper fairing assembly (see Upper Fairing
Assembly Removal in the Frame chapter).
Remove the canister [A].
Visually inspect the canister for cracks or other damage.
If the canister has any cracks or bad damage, replace it
with a new one.
NO ...