Kawasaki Ninja Service Manual: Throttle Body Assy Holder

Kawasaki Ninja Service Manual / Engine Top End / Throttle Body Assy Holder

Operating Procedures
Clean the seat area carefully. Coat the seat with machinist’s dye. Fit a 45° cutter into the holder and slide it into the valve guide. Press down lightly on the handle and turn it right ...

Throttle Body Assy Holder Removal
Remove: Throttle Body Assy (see Throttle Body Assy Removal in the Fuel System (DFI) chapter) Clamps [A] Loosen the throttle body assy holder bolts as shown sequence [1 3] in the figure, ...

Other materials:

Piston Removal
Remove: Crankshaft (see Crankshaft Removal) Remove the piston together with the connecting rod to the cylinder head side. NOTICE Discard the connecting rod bolts and nuts. To prevent damage to the crankpin surfaces, do not allow the connecting rod bolts to bump against the crankpins. ...

Fuel Flow Rate Inspection
WARNINGGasoline is extremely flammable and can be explosive under certain conditions, creating the potential for serious burns. Make sure the area is well-ventilated and free from any source of flame or sparks; this includes any appliance with a pilot light. Do not smoke. T ...

Air Switching Valve Installation
Install the air switching valve [A] with hose [B] as shown in the figure. Front [C] Left Side View [D] White Paint [E] Air Switching Valve Operation Test Refer to the Air Suction System Damage Inspection in the Periodic Maintenance chapter. Air Switching Valve Unit Test ...