Kawasaki Ninja Service Manual: Camshaft Runout Inspection

Kawasaki Ninja Service Manual / Engine Top End / Camshaft, Camshaft Chain / Camshaft Runout Inspection

If the runout exceeds the service limit, replace the camshaft.

Camshaft Runout Standard: TIR 0.02 mm (0.0008 in.) or less Service Limit: TIR 0.1 mm (0.004 in.)

Camshaft Runout Inspection


Camshaft, Camshaft Cap Wear Inspection
Remove the camshaft caps (see Camshaft Removal). Cut the strips of plastigage (press gauge) to journal width. Place a strip on each journal parallel to the camshaft installed in the correct ...

Cam Wear Inspection
Remove the camshafts (see Camshaft Removal). Measure the height [A] of each cam with a micrometer. If the cams are worn down past the service limit, replace the camshaft. Cam Height Standar ...

Other materials:

Air Switching Valve Installation
Install the air switching valve [A] with hose [B] as shown in the figure. Front [C] Left Side View [D] White Paint [E] Air Switching Valve Operation Test Refer to the Air Suction System Damage Inspection in the Periodic Maintenance chapter. Air Switching Valve Unit Test ...

For Secondary Fuel Injectors
Remove the fuel tank (see Fuel Tank Removal). Disconnect the injector connector and connect the harness adapter [A] between these connectors as shown in the figure. Main Harness [B] Secondary Fuel Injector #1 [C] Special Tool - Measuring Adapter: 57001-1700 Connect a digital me ...

Axle Inspection
Remove the front and rear axles (see Front/Rear Wheel Removal). Visually inspect the front and rear axle for damages. If the axle is damaged or bent, replace it. Place the axle in V blocks that are 100 mm (3.94 in.) [A] apart, and set a dial gauge [B] on the axle at a point halfway ...