Kawasaki Ninja Service Manual: Camshaft Runout Inspection

Kawasaki Ninja Service Manual / Engine Top End / Camshaft, Camshaft Chain / Camshaft Runout Inspection

If the runout exceeds the service limit, replace the camshaft.

Camshaft Runout Standard: TIR 0.02 mm (0.0008 in.) or less Service Limit: TIR 0.1 mm (0.004 in.)

Camshaft Runout Inspection


Camshaft, Camshaft Cap Wear Inspection
Remove the camshaft caps (see Camshaft Removal). Cut the strips of plastigage (press gauge) to journal width. Place a strip on each journal parallel to the camshaft installed in the correct ...

Cam Wear Inspection
Remove the camshafts (see Camshaft Removal). Measure the height [A] of each cam with a micrometer. If the cams are worn down past the service limit, replace the camshaft. Cam Height Standar ...

Other materials:

Swingarm Bearing Installation
Replace the needle bearings, ball bearing, grease seals and circlip with new ones. Install the needle bearings, ball bearing, grease seals and circlip as shown in the figure. Insert the needle bearing driver [A] into the needle bearing [B] and press the needle bearing into the housing u ...

Hub Bearing Installation
Before installing the hub bearings, blow any dirt or foreign particles out of the hub with compressed air to prevent contamination of the bearings. Replace the bearings with new ones. Install the bearings by using the bearing driver set which does not contact the bearing inner race. ...

Main Throttle Sensor Output Voltage Inspection
Measure the output voltage at the main throttle sensor in the same way as input voltage inspection, note the following. Disconnect the main throttle sensor connector and connect the setting adapter [A] between these connectors. Special Tool - Throttle Sensor Setting Adapter: 57001 -15 ...