NOTE
Be sure the battery is fully charged.
For Secondary Fuel Injectors
For Primary Fuel InjectorsEngine Vacuum Synchronization Inspection
NOTE
These procedures are explained on the assumption that
the intake and exhaust systems of the engine are in
good condition.
Situate the motorcycle so that it is vertical.
Remove:
Fuel Tank (see Fuel Tank Removal in the Fuel System
(DFI) chapter)
Air Cleaner Housing (see Air Cleaner ...
Subthrottle Valve Actuator Input Voltage Inspection
NOTE
Be sure the battery is fully charged.
Turn the ignition switch to OFF.
Disconnect the subthrottle valve actuator connector and
connect the measuring adapter [A] between these connectors
as shown in the figure.
Main Harness [B]
Subthrottle Valve Actuator [C]
Special Tool ...
Upper Fairing Assembly Disassembly
Remove:
Upper Fairing Assembly (see Upper Fairing Assembly
Removal)
Headlight (see Headlight Removal/Installation in the
Electrical System chapter)
City Light (LED) (see City Light (LED) Removal/Installation
in the Electrical System chapter)
Remove the screws [A], and separate each ...