Break-in
Starting the EngineLower Fairing Installation
Installation is the reverse of removal. Note the following.
When installing the pad [A], align the edge of the pad and
the marking of the fairing [B].
When installing the pad [C], align the edge of the pad and
the fairing [D], and fit the edge of the pad to the boss [E].
Insert the hoo ...
Connecting Rod Twist Inspection
With the big-end arbor [A] still on V block [C], hold the
connecting rod horizontally and measure the amount that
the arbor [B] varies from being paralleled with the surface
plate over a 100 mm (3.94 in.) length of the arbor to determine
the amount of connecting rod twist.
If the conne ...
Piston Ring Thickness Inspection
Measure the piston ring thickness.
Use the micrometer to measure at several points around
the ring.
Piston Ring Thickness
Standard:
Top [A] 0.77 0.79 mm (0.0303
0.0311 in.)
Second [B] 0.78 0.79 mm
(0.0307 0.0311 in.)
Service Limit:
Top 0.70 mm (0.0276 in.)
Second 0.71 mm (0.0280 ...