Break-in
Starting the EngineConnecting Rod Big End Side Clearance Inspection
Measure connecting rod big end side clearance.
Insert a thickness gauge [A] between the big end and either
crank web to determine clearance.
Connecting Rod Big End Side Clearance
Standard: 0.13 0.38 mm
(0.0051 0.0150 in.)
Service Limit: 0.58 mm (0.023 in.)
If the clearance exceeds ...
Rear Shock Absorber Installation
Replace the rear shock absorber nuts and tie-rod nuts
with new ones.
Tighten:
Torque - Rear Shock Absorber Nuts: 34 N·m (3.5 kgf·m, 25
ft·lb)
Tie-Rod Nuts: 34 N·m (3.5 kgf·m, 25 ft·lb)
When installing the rear shock absorber bracket [A], install
it so that the recess side [B] ...
ESD (Electronic Steering Damper) ECU Communication Error (Service Code 3C,
ZX1000JD/KD)
ESD ECU Communication Line Inspection
When the data (for status of ESD system) is not sent from
the ESD ECU to the meter unit and ECU, the service code
3C is displayed.
The data is sent through the CAN communication line.
The service code 3C is detected with the meter unit.
The FI symbol does ...