Kawasaki Ninja Service Manual: Meter, Gauge, Indicator Unit

Kawasaki Ninja Service Manual / Electrical System / Meter, Gauge, Indicator Unit

Radiator Fan System
Fan Motor Inspection Remove the air cleaner housing (see Air Cleaner Housing Removal in the Fuel System (DFI) chapter). Disconnect the connector [A]. Using an auxiliary leads, supply battery ...

Meter Unit Removal/Installation
Remove the upper fairing assembly (see Upper Fairing Assembly Removal in the Frame chapter) Remove the bolt [A] (other than US, CA and CALmodels). Slide back the dust cover and disconnect the ...

Other materials:

Shift Pedal Installation
Install the rubber damper to the shift pedal. Turn the chamfered side to inside. Assemble: Shift Lever [A] and Locknut [B] (Left-hand Thread) Shift Pedal [C] and Locknut [D] Tie-Rod [E] Turn the grooved end [F] of the tie-rod to the shift lever. Apply grease to the sliding ...

Drive Chain Removal/Installation
NOTE Since the drive chain is installed through the swingarm, The chain can not be removed other than by cutting it. Prepare the new link pin, link plate, grease seals, and tools for rejoining the chain. Remove: Bolts [A] Front Footpeg Bracket [B] Remove: Bolts [A] Chain Cover [B] ...

General Information
All rights reserved. No parts of this publication may be reproduced, stored in a retrieval system, or transmitted in any form or by any means, electronic mechanical photocopying, recording or otherwise, without the prior written permission of Quality Assurance Division/Motorcycle & Engin ...