Radiator Fan System
Meter Unit Removal/InstallationFuel Injector Audible Inspection
NOTE
Be sure the battery is fully charged.
The secondary fuel injectors are operating with following
conditions.
1. The engine speed is more than 6 000 r/min (rpm).
2. The throttle opening is more than 12В°.
Remove:
Fuel Tank (see Fuel Tank Removal)
Primary Fuel Hose (see Fuel ...
ZX1000JC /KC
Models
1. Run the fuse box 2 lead in front of the rib for the fuse box 2.
2. Seat Lock Cable
3. Hook the licence plate light lead and the left turn signal light lead on
the projection of the tool
kit case.
4. Rib for Fuse Box 2
5. Run the starter relay lead in back of the rib for the fuse box 2 ...
Storage
Preparation for Storage
Clean the entire vehicle thoroughly
Run the engine for about five minutes to warm the oil, shut it off, and
drain the
engine oil.
WARNINGEngine oil is a toxic substance. Dispose
of used oil properly. Contact
your local authorities for approved disp ...