Kawasaki Ninja Service Manual: Battery

Kawasaki Ninja Service Manual / Electrical System / Battery

Electrical Wiring
Wiring Inspection Visually inspect the wiring for signs of burning, fraying, etc. If any wiring is poor, replace the damaged wiring. Pull each connector [A] apart and inspect it for corro ...

Battery Removal
Turn off the ignition switch. Remove the front seat (see Front Seat Removal in the Frame chapter). Slide the red cap [A]. Disconnect the negative (–) cable [B] and then positive (+) cab ...

Other materials:

Connecting Rod Big End Bearing Insert/Crankpin Wear Inspection
Remove the connecting rod big end (see Connecting Rod Removal). Cut strips of plastigage to crankpin width. Place a strip on the crankpin parallel to the crankshaft installed in the correct position. Tighten the connecting rod big end nuts to the specified torque (see Connecting Rod I ...

Lower Fairing Installation
Installation is the reverse of removal. Note the following. When installing the pad [A], align the edge of the pad and the marking of the fairing [B]. When installing the pad [C], align the edge of the pad and the fairing [D], and fit the edge of the pad to the boss [E]. Insert the hoo ...

KIBS Hydraulic Unit Removal
NOTICE The KIBS hydraulic unit [A] has been adjusted and set with precision at the factory. Therefore, it should be handled carefully, never struck sharply, as with a hammer, or allowed to fall on a hard surface. Be careful not to get water or mud on the KIBS hydraulic unit. Drain the b ...