Starter Clutch Inspection
Transmission Assy RemovalCheck 3-6: Neutral Indicator Light (LED) Inspection
Connect the leads in the same circuit as Check 3-2.
Connect the terminal [8] to the battery (–) terminal.
Check that the neutral indicator light (LED) [A] goes on.
If the indicator light does not go on, replace the meter unit.
...
Connecting Rod Twist Inspection
With the big-end arbor [A] still on V block [C], hold the
connecting rod horizontally and measure the amount that
the arbor [B] varies from being paralleled with the surface
plate over a 100 mm (3.94 in.) length of the arbor to determine
the amount of connecting rod twist.
If the conne ...
Front Fork Installation (Each Fork Leg)
Install the fork so that the top plug end [A] as shown in the
figure.
11 mm (0.43 in.) [B]
Steering Stem Head [C]
Tighten:
Torque - Front Fork Clamp Bolts (Lower): 23 N·m (2.3
kgf·m, 17 ft·lb)
NOTE
Tighten the two lower front fork clamp bolts alternately
two times to ensur ...