NOTICE
Do not tap the screwdrivers. The rim could be damaged

Balance Adjustment
Balance Weight InstallationCheck 3-6: Neutral Indicator Light (LED) Inspection
Connect the leads in the same circuit as Check 3-2.
Connect the terminal [8] to the battery (–) terminal.
Check that the neutral indicator light (LED) [A] goes on.
If the indicator light does not go on, replace the meter unit.
...
Shift Drum Assembly
Press and insert the ball bearing [A] on the shift drum [B]
until it is bottomed.
Install:
Ball Bearing [C]
Dowel Pin [D] and Shift Drum Cam [E]
Align the pin with the groove in the shift drum cam.
Apply a non-permanent locking agent to the shift drum
cam holder bolt [F].
Tight ...
Refreshing Charge
Remove the battery (see Battery Removal).
Do refresh charge by following method according to the
battery terminal voltage.
WARNINGThis battery is sealed type. Charge with
current and
time as stated below.
Terminal Voltage: 12.0 12.7
V
Standard Charge (see following ...