Kawasaki Ninja Service Manual: Engine Removal/Installation

Kawasaki Ninja Service Manual / Engine Removal/Installation

Oil Pressure Switch Installation
Using a high flash-point solvent, clean off any oil or dirt that may be on the silicone sealant coating area. Dry them with a clean cloth. Apply silicone sealant to the threads of the oil pre ...

Exploded View
M: Apply molybdenum disulfide grease. R: Replacement Parts S: Follow the specified tightening sequence. Special Tool Engine Mount Nut Wrench: 57001-1450 ...

Other materials:

Fuel Pump Operating Voltage Inspection
NOTE Be sure the battery is fully charged. Turn the ignition switch to OFF. Remove: Fuel Tank Bolts (see Fuel Tank Removal) Fuel Tank Bracket Bolts (see Fuel Tank Removal) Disconnect the fuel pump lead connector and connect the harness adapter [A] between these connectors as shown i ...

Tire Wear, Damage
As the tire tread wears down, the tire becomes more susceptible to puncture and failure. An accepted estimate is that 90% of all tire failures occur during the last 10% of tread life (90% worn). So it is false economy and unsafe to use the tires until they are bald In accordance with the ...

Connecting Rod Installation
NOTICE To minimize vibration, the connecting rods should have the same weight mark. Big End Cap [A] Connecting Rod [B] Weight Mark, Alphabet [C] Diameter Mark [D] (“” or No Mark) NOTICE If the connecting rods, big end bearing inserts, or crankshaft are replaced with new ones, select ...