Diode Circuit Inspection
30 A Main/15 A ECU Fuse RemovalSpecial Tools and Sealant
Hand Tester:
57001-1394
Flywheel Puller Assembly, M38 × 1.5/M35 × 1.5:
57001-1405
Peak Voltage Adapter:
57001-1415
Lead Wire - Peak Voltage Adapter:
57001-1449
Key Registration Unit:
57001-1582
Grip:
57001-1591
Flywheel & Pulley Holder:
57001-1605
Rotor Holder:
...
Battery Ground
Before completing any service on the motorcycle, disconnect
the battery cables from the battery to prevent the engine
from accidentally turning over. Disconnect the ground
cable (–) first and then the positive (+). When completed
with the service, first connect the positive (+) cable to the
p ...
Idle Speed Control Valve Actuator Installation
Replace the O-ring [A] with a new one.
Apply engine oil to the new O-ring.
Install the idle speed control valve [A] as shown in the
figure.
10° [B]
Tighten:
Torque - Idle Speed Control Valve Actuator Retainer
Screws: 2.06 N·m (0.21 kgf·m, 18 in·lb)
Install th ...