Kawasaki Ninja Service Manual: Upper Inner Fairing Removal

Kawasaki Ninja Service Manual / Frame / Fairings / Upper Inner Fairing Removal

Upper Inner Fairing Removal


Upper Fairing Assembly Disassembly
Remove: Upper Fairing Assembly (see Upper Fairing Assembly Removal) Headlight (see Headlight Removal/Installation in the Electrical System chapter) City Light (LED) (see City Light (LED) ...

Upper Inner Fairing Installation
Installation is the reverse of removal. Note the following. Place the tab [A] under the cover as shown in the figure. Insert the projection [B] into the grommet [C]. ...

Other materials:

Special Tools
Inside Circlip Pliers: 57001-143 Oil Seal & Bearing Remover: 57001-1058 Bearing Driver Set: 57001-1129 Jack: 57001-1238 Bearing Remover Head, 15 × 17: 57001-1267 Fork Oil Level Gauge: 57001-1290 Bearing Remover Shaft, 13: 57001-1377 Fork Oil Seal Driver, 43: 57001-15 ...

Mud Guard Installation
Installation is the reverse of removal. Note the following. Run the hose and lead correctly (see Cable, Wire, and Hose Routing section in the Appendix chapter). Check the brake line. Apply a non-permanent locking agent to the threads of the mud guard mounting bolts [A, B], and tighten them ...

Air Switching Valve Installation
Install the air switching valve [A] with hose [B] as shown in the figure. Front [C] Left Side View [D] White Paint [E] Air Switching Valve Operation Test Refer to the Air Suction System Damage Inspection in the Periodic Maintenance chapter. Air Switching Valve Unit Test ...