Technical Information - Electronic Steering Damper (ESD/ZX1000JD/KD models)
Periodic Maintenance ChartCoolant Reserve Tank Installation
Install the following to the coolant reserve tank [A].
Pad [B]
Gasket [C]
Cap [D]
Collar [E]
Install the coolant reserve tank and tighten the bolt [F].
Run the hoses correctly (see Cable,Wire, and Hose Routing
section in the Appendix chapter).
Fill the coolant reserve tank with ...
Turn Signal Relay Inspection
Remove the battery (see Battery Removal).
Take the turn signal relay [A] off the rear fender.
Disconnect the connector [B].
Connect one 12 V battery and turn signal lights as indicated
in the figure, and count how many times the lights
blink for one minute.
Turn Signal Relay ...
Stator Coil Installation
Apply a non-permanent locking agent to the threads of
the stator coil bolts and tighten them.
Torque - Stator Coil Bolts: 12 N·m (1.2 kgf·m, 106 in·lb)
Using a high flash-point solvent, clean off any oil or dirt
that may be on the silicone sealant coating area. Dry
them with a clea ...