Kawasaki Ninja Service Manual: Replacement Parts

Kawasaki Ninja Service Manual / Periodic Maintenance / Periodic Maintenance Procedures / Replacement Parts

Bolts, Nuts and Fasteners Tightness Inspection
Check the tightness of the bolts and nuts listed here. Also, check to see that each cotter pin is in place and in good condition. NOTE For the engine fasteners, check the tightness of them ...

Air Cleaner Element Replacement
NOTE In dusty areas, the element should be replaced more frequently than the recommended interval. WARNINGIf dirt or dust is allowed to pass through into the throttle body assy, the t ...

Other materials:

Air Cleaner Housing Assembly
Install the ducts to the air cleaner housing. Fit the projections [A] of the duct into the slits [B] on the air cleaner housing. Tighten the screws [A]. Torque - Air Cleaner Housing Duct Screws: 1.1 N·m (0.11 kgf·m, 10 in·lb) Install: Air Cleaner Gasket [A] Duct [B] ...

Water Temperature Sensor Output Voltage Inspection
NOTE Be sure the battery is fully charged. Turn the ignition switch to OFF. Remove the throttle body assy (see Throttle Body Assy Removal in the Fuel System (DFI) chapter). Disconnect the water temperature sensor connector and connect the measuring adapter [A] between these connectors ...

Spring Preload Adjustment
Remove the rear shock absorber from the frame (see Rear Shock Absorber Removal). Loosen the locknut and turn out the adjusting nut to free the spring. Special Tools - Hook Wrench T=3.2 R37: 57001-1539 Hook Wrench R=35: 57001-1580 To adjust the spring preload, turn in the adjusting n ...