Air Cleaner Element Removal/Installation
Nozzle Assy Assembly
Air Cleaner Element InspectionRelay Box Removal
Remove the left fuel tank cover (see Fuel Tank Removal
in the Fuel System (DFI) chapter).
Disconnect the connectors [A].
Pull out the relay box [B] from the rubber protector [C].
NOTE
The relay box has relays and diodes. The relays and
diodes can not be removed.
Relay Box Installa ...
Bolt and Nut Tightening
In accordance with the Periodic Maintenance Chart, it is very important to
check
the tightness of the bolts and nuts listed here. Also, check to see that each
cotter
pin is in place and in good condition. Please ask your authorized Kawasaki
dealer
for torque values.
1. Clutch Lever Hol ...
Air Switching Valve Installation
Install the air switching valve [A] with hose [B] as shown
in the figure.
Front [C]
Left Side View [D]
White Paint [E]
Air Switching Valve Operation Test
Refer to the Air Suction System Damage Inspection in the
Periodic Maintenance chapter.
Air Switching Valve Unit Test ...