Kawasaki Ninja Service Manual: Fenders

Kawasaki Ninja Service Manual / Frame / Fenders

Seat Cover Installation
Installation is the reverse of removal. Note the following. When installing the pad [A], install it along the corner [B] as shown in the figure. When installing the pad [C], align the ends [D] ...

Front Fender Removal
Remove: Bolts [A] with Washers (Both Sides) Reflectors (Both Sides, US, CA, CAL and AU Models) Front Fender [B] Take the brake hose off the clamp [C] (both sides). Front Fender Insta ...

Other materials:

Rear Master Cylinder Removal
Unscrew the brake hose banjo bolt [A] and remove the brake hose (see Brake Hose and Pipe Replacement in the Periodic Maintenance chapter). Remove: Rear Master Cylinder Mounting Bolts [B] Foot Guard [C] Screw and Stopper [D] Bolt [E] Front Footpeg Bracket Bolts [F] Cable Guide [G ...

Fuel Hose Replacement
Remove the fuel tank (see Fuel Tank Removal in the Fuel System (DFI) chapter). WARNINGFuel is flammable and explosive under certain conditions and can cause severe burns. Be prepared for fuel spillage; any spilled fuel must be completely wiped up immediately. When the fue ...

Exhaust Butterfly Valve Cable Installation
Confirm whether pulley [A] is an angle shown in the figure. 41.7° ±7° [B] This position is original position of the pulley. NOTE Correct the position electrically after confirming the use is discontinued and there is no damage when differing from the angle of shown in the figure. ...