Kawasaki Ninja Service Manual: Sprocket, Coupling

Kawasaki Ninja Service Manual / Final Drive / Sprocket, Coupling

Drive Chain Removal/Installation
NOTE Since the drive chain is installed through the swingarm, The chain can not be removed other than by cutting it. Prepare the new link pin, link plate, grease seals, and tools for rejoining t ...

Engine Sprocket Removal
Remove: Engine Sprocket Cover Bolts [A] Engine Sprocket Cover [B] Flatten out the bended washer [A]. Remove the engine sprocket nut [B] and washer. NOTE When loosening the engin ...

Other materials:

KIBS Hydraulic Unit Removal
NOTICE The KIBS hydraulic unit [A] has been adjusted and set with precision at the factory. Therefore, it should be handled carefully, never struck sharply, as with a hammer, or allowed to fall on a hard surface. Be careful not to get water or mud on the KIBS hydraulic unit. Drain the b ...

Special Tools and Sealant
Hand Tester: 57001-1394 Flywheel Puller Assembly, M38 × 1.5/M35 × 1.5: 57001-1405 Peak Voltage Adapter: 57001-1415 Lead Wire - Peak Voltage Adapter: 57001-1449 Key Registration Unit: 57001-1582 Grip: 57001-1591 Flywheel & Pulley Holder: 57001-1605 Rotor Holder: ...

Break-in
The first 1 600 km (1 000 mi) that the motorcycle is ridden is designated as the break-in period. If the motorcycle is not used carefully during this period, you may very well end up with a “broken down” instead of a “broken in” motorcycle after a few thousand kilometers. The fol ...