Special Tools
Front Wheel RemovalBattery
The battery installed in this motorcycle
is a sealed type, so it is not necessary
to check the battery electrolyte
level or add distilled water.
The sealing strip should not be pulled
off once the specified electrolyte has
been installed in the battery for initial
service.
However, in or ...
ESD Actuator Input Voltage Inspection
NOTE
Be sure the battery is fully charged.
Turn the ignition switch to OFF.
Disconnect the ESD actuator connector and connect a
suitable measuring leads [A] between these connectors
as shown.
Main Harness [B]
ESD Actuator [C]
Connect the peak voltage adapter [D] and a digital ...
Turn Signal Relay Inspection
Remove the battery (see Battery Removal).
Take the turn signal relay [A] off the rear fender.
Disconnect the connector [B].
Connect one 12 V battery and turn signal lights as indicated
in the figure, and count how many times the lights
blink for one minute.
Turn Signal Relay ...