External Shift Mechanism Inspection
Exploded ViewExploded View
11. ZX1000JD/KD
AD: Apply adhesive.
AL: Tighten the two clamp bolts alternately two times to ensure even tightening
torque.
G: Apply grease.
L: Apply a non-permanent locking agent.
Specifications
...
Vehicle-down Sensor Input Voltage Inspection
NOTE
Be sure the battery is fully charged.
Turn the ignition switch to OFF.
Disconnect the vehicle-down sensor connector and connect
the measuring adapter [A] between these connectors
as shown in the figure.
Main Harness [B]
Vehicle-down Sensor [C]
Special Tool - Measuring Adapte ...
CAN Communication Line
CAN Communication Line
Resistance Inspection
In this model, resistors for CAN communication line are
built in the ECU [A] and meter unit.
Refer to the Meter Unit Inspection in the Electrical System
chapter for the resistor in the meter unit.
Turn the ignition switch to OFF.
Remove:
EC ...