Kawasaki Ninja Service Manual: Oil Pump

Kawasaki Ninja Service Manual / Engine Lubrication System / Oil Pump

Oil Pressure Relief Valve Inspection
Remove the oil pressure relief valve (see Oil Pressure Relief Valve Removal). Check to see if the valve [A] slides smoothly when pushing it in with a wooden or other soft rod, and see if it c ...

Oil Pump Removal
Remove: Coolant (Drain, see Coolant Change in the Periodic Maintenance chapter) Engine Oil (Drain, see Engine Oil Change in the Periodic Maintenance chapter) Sidestand Switch Lead Connect ...

Other materials:

Check 3-4: Turn Signal Indicator Light (LED) Inspection
Connect the leads in the same circuit as Check 3-2. Connect the terminal [5] to the battery (+) terminal. Connect the terminal [6] to the battery (+) terminal. Check that the turn signal indicator light (LED) [A] goes on. If the indicator light does not go on, replace the meter ...

Coolant Reserve Tank Installation
Install the following to the coolant reserve tank [A]. Pad [B] Gasket [C] Cap [D] Collar [E] Install the coolant reserve tank and tighten the bolt [F]. Run the hoses correctly (see Cable,Wire, and Hose Routing section in the Appendix chapter). Fill the coolant reserve tank with ...

ECU Communication Error (Service Code 39)
ECU Communication Line Inspection When the data is not sent from the ECU to the meter unit for more than about 10 seconds, the service code 39 is displayed. The data is sent through the CAN communication line. The service code 39 is detected with the meter unit. When the user mode, this commun ...