Special Tools
Rebound Damping Force AdjustmentBefore Servicing
Before starting to perform an inspection service or carry out a disassembly
and reassembly operation
on a motorcycle, read the precautions given below. To facilitate actual
operations, notes, illustrations,
photographs, cautions, and detailed descriptions have been included in each
chapter w ...
Lights and Switches Operation Inspection
First Step
Set the gear position in the neutral position.
Turn the ignition switch to ON.
The following lights should go on according to below table.
If the following light does not go on, inspect the meter
unit (see Meter Unit Inspection in the Electrical System
chapter).
...
Diode Circuit Inspection
Remove the relay box (see Relay Box Removal).
Check conductivity of the following pairs of terminals (see
Relay Box Internal Circuit in this section).
Diode Circuit Inspection
The resistance should be low in one direction and more
than 10 times as much in the other direction. If any dio ...