Rocker Arm/Tie-Rod Bearing, Sleeve Inspection
Exploded ViewSidestand Installation
Replace the sidestand nut [A] with a new one.
Apply grease to the sliding areas [B].
Tighten the sidestand bolt [C] first, and then the sidestand
nut.
Torque - Sidestand Bolt: 44 N·m (4.5 kgf·m, 32 ft·lb)
Sidestand Nut: 29 N·m (3.0 kgf·m, 21 ft·lb)
Install the spring [D] as sh ...
Crankshaft Main Bearing
Insert/Journal Wear Inspection
Split the crankcase (see Crankcase Splitting).
Cut strips of plastigage to journal width.
Place a strip on each journal parallel to the crankshaft
installed in the correct position.
Tighten the crankcase bolts to the specified torque (see
Crankcase Assembly).
NOTE
Do not turn ...
CAN Communication Line
CAN Communication Line
Resistance Inspection
In this model, resistors for CAN communication line are
built in the ECU [A] and meter unit.
Refer to the Meter Unit Inspection in the Electrical System
chapter for the resistor in the meter unit.
Turn the ignition switch to OFF.
Remove:
EC ...