Kawasaki Ninja Service Manual: Cooling System

Kawasaki Ninja Service Manual / Cooling System

Canister Inspection
Refer to the Evaporative Emission Control System Inspection (CAL and SEA-B1 Models) in the Periodic Maintenance chapter. 1. Green Hoses (Purge) 2. Fittings 3. Canister 4. White Hose ( ...

Exploded View
14. Thermostat 15. Frame No. JKAZXT00JJA003074 or JKAZXCJ1 BA003074 G: Apply grease. HG: Apply high-temperature grease. L: Apply a non-permanent locking agent. R: Replacement Parts ...

Other materials:

Tie-Rod and Rocker Arm Bearing Installation
Replace the needle bearings [A] and oil seals with new ones. Apply plenty of grease to the lips of the oil seals. Install the needle bearings and oil seals position as shown in the figure. Screw the needle bearing driver into the driver holder. Insert the needle bearing driver into th ...

Oil Pump Drive Gear Shaft Installation
Apply molybdenum disulfide grease [A] to the oil pump drive gear shaft. Apply molybdenum disulfide oil solution to the followings. Transmission Case [B] Crankcase [C] Install the oil pump drive gear shaft and washer [D] as shown in the figure. Install the new circlip [E] into the ...

Camshaft Runout Inspection
Remove the camshafts (see Camshaft Removal). Set the camshaft in a camshaft alignment jig or on V blocks. Measure the runout with a dial gauge at the specified place as shown in the figure. If the runout exceeds the service limit, replace the camshaft. Camshaft Runout Standard: TIR ...