Kawasaki Ninja Service Manual: Cooling System

Kawasaki Ninja Service Manual / Cooling System

Canister Inspection
Refer to the Evaporative Emission Control System Inspection (CAL and SEA-B1 Models) in the Periodic Maintenance chapter. 1. Green Hoses (Purge) 2. Fittings 3. Canister 4. White Hose ( ...

Exploded View
14. Thermostat 15. Frame No. JKAZXT00JJA003074 or JKAZXCJ1 BA003074 G: Apply grease. HG: Apply high-temperature grease. L: Apply a non-permanent locking agent. R: Replacement Parts ...

Other materials:

Transmission Shaft Assembly
Apply molybdenum disulfide oil solution to the sliding surfaces of the gears and shafts. Install the gears and the gear bushings [A] with their holes [B] aligned. Replace any circlips removed with new ones. Install the circlips [A] so that the opening [B] of it is aligned with ...

Cylinder (Upper Crankcase) Wear Inspection
Split the crankcase (see Crankcase Splitting). Remove the pistons (see Piston Removal). Assemble the cylinder (upper crankcase) [A], the cylinder head [B] and the cylinder head gasket [C]. Tighten the cylinder head bolts (see Cylinder Head Installation in the Engine Top End chapter). ...

Shift Drum Assembly
Press and insert the ball bearing [A] on the shift drum [B] until it is bottomed. Install: Ball Bearing [C] Dowel Pin [D] and Shift Drum Cam [E] Align the pin with the groove in the shift drum cam. Apply a non-permanent locking agent to the shift drum cam holder bolt [F]. Tight ...