Kawasaki Ninja Service Manual: Crankshaft/Transmission

Kawasaki Ninja Service Manual / Crankshaft/Transmission

Engine Installation
Apply molybdenum disulfide grease to the threads of the adjusting collars [A]. Install the adjusting collars to crankcase backside until end of the threads. Install the adjusting co ...

Exploded View
25. “1T” marked side faces up. 26. “T2” marked side faces up. 27. Hollow mark faces exhaust side. G: Apply grease. L: Apply a non-permanent locking agent. LG: Apply liqu ...

Other materials:

Check 3-7 Stop Watch Inspection
Connect the leads in the same circuit as Check 3-2. By pushing the upper button each time to set the stop watch mode. Connect the insulated auxiliary lead processed insulation to the terminal [13] as shown in the figure, then stop watch start to count. While count the stop watch, conn ...

Connecting Rod Installation
NOTICE To minimize vibration, the connecting rods should have the same weight mark. Big End Cap [A] Connecting Rod [B] Weight Mark, Alphabet [C] Diameter Mark [D] (“” or No Mark) NOTICE If the connecting rods, big end bearing inserts, or crankshaft are replaced with new ones, select ...

Stick Coil Primary Peak Voltage Inspection
NOTE Be sure the battery is fully charged. Remove the stick coils (see Stick Coil Removal). Do not remove the spark plugs. Connect the ECU to the harness. Measure the primary peak voltage as follows. Install the new spark plug [A] into each stick coil [B], and ground them onto ...