Engine Installation
Exploded ViewAir Intake Solenoid Valve (Service Code 2d, Equipped Models)
Air Intake Solenoid Valve Removal/Installation
Refer to the Air Intake Solenoid Valve Removal/Installation
in the Fuel System (DFI) chapter.
Air Intake Solenoid Valve Inspection
Refer to the Air Intake Solenoid Valve Unit Test in the
Electrical System chapter.
If the air intake ...
Connecting Rod Big End Side Clearance Inspection
Measure connecting rod big end side clearance.
Insert a thickness gauge [A] between the big end and either
crank web to determine clearance.
Connecting Rod Big End Side Clearance
Standard: 0.13 0.38 mm
(0.0051 0.0150 in.)
Service Limit: 0.58 mm (0.023 in.)
If the clearance exceeds ...
Radiator Fan Relay Inspection
Refer to the Relay Circuit Inspection in the Electrical System
chapter
If the radiator fan relay is normal, check the wiring for
continuity, using the wiring diagram in this section.
Special Tool - Hand Tester: 57001-1394
If the wiring is good, check the ECU for its ground and
power supp ...